Concrete paths and exposed aggregate

Side paths, front paths and alfresco areas in concrete, exposed aggregate or pavers: how each is built, estate material rules, drainage and Melbourne prices.

Paths in Rockbank are usually poured concrete, exposed aggregate or pavers on a compacted base, and the right choice depends on your estate rules, where water will run and how much you want to spend. A plain concrete path costs $79 to $170 per sqm in Melbourne, exposed aggregate costs $125 to $210 per sqm, and pavers supplied and laid cost $54 to $145 per sqm. This website forwards your enquiry to an independent provider, and that provider prices the job and is responsible for the finished surface.

Illustrative photo for Concrete paths and exposed aggregate

Which surface suits which path?

Surface Installed, per sqm
Plain concrete $79 to $170 per sqm
Exposed aggregate $125 to $210 per sqm
Pavers on crushed rock $54 to $145 per sqm
Crushed rock or gravel Quoted per job
  • Plain concrete: lowest cost, quick, and good for side paths and clothesline pads. The finish is plain grey, and it is banned for front paths in some estates.
  • Exposed aggregate: hard wearing, grippy and matches many new driveways. It costs more, and the stone colour varies batch to batch.
  • Pavers on crushed rock: can be lifted for repairs and come in many colours. The edges need restraint, and weeds grow in the joints if they are not sealed.
  • Crushed rock or gravel: cheap, permeable and good for side access. It migrates onto the lawn and does not suit wheelchairs or prams.

Concrete and paving prices from the What’s The Damage Melbourne guides include GST and are based on the Melbourne metro area, and the guide notes outer suburbs may vary. Small or awkward pours cost more per square metre because the set-up, pump or barrow work and finishing time are the same for a short path as a long one.

Estate material rules

Check your design guidelines before choosing. Woodlea’s guidelines list the materials allowed for front paths, porches and side access paths by character precinct. In Precinct 1 the list includes natural stone paving, exposed aggregate concrete, precast concrete pavers, crushed stone or gravel, decorative pebbles, timber decking and concrete coloured to match the driveway, and plain concrete is not permitted. The same guidelines cap impermeable hard surfaces, including the driveway and front path, at 40% of the front garden. Side paths behind the side gate and back yard paving are usually outside those controls, which is why many owners pour plain concrete down the side and use aggregate at the front.

Drainage comes first

The Building and Plumbing Commission says no building permit is needed to lay paving or build a driveway, but it recommends a registered building practitioner because incorrectly laid paving can cause water damage to your house. It also warns that paving can interfere with plumbing such as drainage, so check whether the work changes where water flows.

On a new Rockbank block that means:

  • paths fall away from the house, not towards the slab
  • strip drains or grates where a path meets the house at a door or alfresco
  • stormwater pits and inspection openings stay exposed and at finished level
  • downpipes are not buried under a slab without the drainage being checked first
  • reactive clay underneath is allowed for with a proper crushed rock base and control joints

What a provider checks before pricing

  • Length, width and thickness, and whether a car will ever drive on it.
  • Access for a concrete truck or pump, and how far material has to be barrowed.
  • Levels against the house, fences and the neighbour’s yard.
  • Services: Before You Dig Australia plans, plus your own plumbing and electrical runs.
  • Conduits or irrigation sleeves to be laid under the path before the pour.
  • Council assets: any work outside your boundary, such as widening the crossover, needs Melton City Council approval through its engineering applications, which include a variation to crossover and works within the road reserve.

How a concrete or aggregate path is built

  1. Excavate to depth and remove soft spots.
  2. Lay and compact crushed rock.
  3. Set formwork to falls and add steel mesh where specified.
  4. Pour, screed and float; for exposed aggregate, wash off the surface paste at the right time to reveal the stone.
  5. Cut or tool control joints so cracking happens along a line.
  6. Cure, strip formwork and backfill edges with soil or edging.

Under the permanent water saving rules, water must not be used to clean hard surfaces such as concrete, paths and driveways, though exemptions apply during construction and for hazards or staining. Ask your provider how they will wash off exposed aggregate and handle the slurry so it does not go down the stormwater drain.

What a careful provider will not do

  • Pour over a pit, an inspection opening or the property’s legal point of discharge.
  • Skip control joints on a long path to save time.
  • Run a path flush with the house brickwork with no fall away.
  • Damage the nature strip or kerb and leave it; Melton’s asset protection page makes the builder, owner builder or owner responsible for reinstating the nature strip.

Next step

Measure the paths you want, mark where water pools after rain, and request a quote for paths or exposed aggregate. If the paths form part of a bigger yard, the Rockbank landscaping cost guide and the new home landscaping page help you put the whole budget together, and Thornhill Park owners will find notes on that area’s newer blocks.

Send a job enquiry

Frequently asked questions

Do I need a permit to pour a path or lay paving?

The BPC says no building permit is needed for paving or driveways. Work outside your boundary, such as changing the crossover, needs Melton City Council approval.

Is exposed aggregate worth the extra cost over plain concrete?

It is harder wearing, has better grip when wet and hides marks. It also suits estates that do not allow plain concrete at the front. For side paths out of view, plain concrete is often enough.

How thick should a concrete path be?

That depends on use. A pedestrian path is thinner than anything a car or trailer will cross. Ask the provider to state the slab thickness, base depth and any steel mesh in the quote.

Why do concrete paths crack?

Reactive clay moving underneath, a thin or poorly compacted base, and missing control joints are the main causes. Joints let cracking follow a straight line instead of wandering across the slab.

Can I hose down a new exposed aggregate path?

The permanent water saving rules ban using water to clean hard surfaces, with exemptions during construction and for hazards or staining. Ask your provider how the surface paste and slurry will be handled.